Figures here come from PLN's published plans as reported by Global Energy Monitor, from the Asian Development Bank's project records and from the contractor that laid the Java cables. Capacities differ a little between sources, so treat them as approximate.
Who runs the grid
PLN (Perusahaan Listrik Negara), the state electricity company, owns the grid and sells power to every home and business in Bali. PLN's Bali office (UID Bali) runs distribution on the island, while the power plants are run by PLN's generating companies or by private operators who sell their output to PLN. Bali is part of the Java–Bali grid, the largest in Indonesia, but it is at the very end of it, linked only by cables across a narrow strait.
The power plants on the island
Bali's plants of 1 MW or more add up to about 1,100 MW.
| Plant | Where | Fuel | About |
|---|---|---|---|
| Celukan Bawang | north coast, west of Singaraja | coal | 380 MW |
| Pesanggaran | south Denpasar, near Benoa harbour | gas, oil and diesel | 480 MW across three plants |
| Gilimanuk | far west, by the ferry port | gas | 134 MW |
| Pemaron | north coast, near Lovina | gas | 98 MW |
| Nusa Penida | Nusa Penida island | diesel, solar and batteries | about 9 MW |
| Solar and hydro | Kayubihi (Bangli), Kubu (Karangasem), Panji and others | sun and water | a few MW in total |
Celukan Bawang is Bali's only coal plant and its single largest source of power. It opened in 2015, was built and is owned by Chinese investors, and has been the subject of protests by local fishing villages and environmental groups.
Pesanggaran is the plant you can see from the Bypass Ngurah Rai near Benoa. It started as a diesel station, and its newer engines and turbines can burn gas, which is shipped in as liquefied gas. The plants at Gilimanuk and Pemaron are gas turbines used mainly when demand peaks in the evening.
Nusa Penida is not connected to the main grid. It runs on its own small system of diesel engines and a hybrid solar plant with a battery, so outages there have nothing to do with the mainland.
Bali has no large geothermal plant. A project at Bedugul, in the highlands around the sacred lakes, was halted in the 1990s after protests, and has not restarted.
The cables from Java
Bali has drawn power from Java since the late 1990s, through 150 kV cables laid on the seabed of the Bali Strait between Ketapang, near Banyuwangi in East Java, and Gilimanuk in west Bali, a crossing of only a few kilometres.
- The first two circuits came into service in 1999 and 2000.
- In 2014 a second pair was laid to replace and reinforce them, by a consortium of Boskalis, Sumitomo and J-Power Systems, and covered with rock along almost the whole route to protect them from anchors and currents.
- Today there are four circuits. PLN's plans give their combined capacity as roughly 340 to 400 MW.
In 2019 about 30% of the electricity used in Bali came from Java, and in 2020 about a quarter of the supply. That makes the cables both a lifeline and a weak point: on 2 May 2025, a fault on the Java link was followed by a blackout across the whole island. See power cuts in Bali.
The 500 kV crossing that was never built
To bring much more power from Java, PLN planned the Java–Bali Crossing: a 500 kV overhead line about 220 km long from the Paiton power plants in East Java to a new substation at Antosari in Tabanan, with capacity for around 1,500 MW. To span the Bali Strait it would have needed two pylons of about 363 m and 376 m, which would have been the tallest power towers in the world.
The Asian Development Bank agreed loans for it in 2013. But land had to be bought for hundreds of towers across west Bali, and many Balinese objected to giant pylons near temples, as nothing should stand higher than a sacred place. In December 2018 the ADB cancelled the parts of its loan for the line and the new substations, at PLN's request, because of the land problems. The money that was left upgraded eleven existing substations in Bali. The line has not been built.
Why the grid is stretched
Peak demand in Bali is now around 1,300 MW, and it keeps rising with tourism, new villas and air conditioning. With limited room to bring more from Java and no appetite for new coal, there is little spare capacity at busy times, which is why a fault on one link or plant can cause wider cuts.
Clean energy plans
- Bali Clean Energy: a 2019 governor's regulation set out to make Bali an island of clean energy, encouraging rooftop solar on government buildings, hotels and homes, and electric vehicles.
- Net zero by 2045: in 2022 Bali set itself a goal of net zero emissions by 2045, fifteen years before Indonesia's national target of 2060. In 2022, renewables still produced less than 2% of Bali's electricity.
- Gas as a bridge: Bali's energy plan relies on natural gas to replace diesel and coal over time, alongside solar.
- New projects: PLN has planned two 25 MW solar farms, in the east and west of the island, and wind farms have been proposed for the north coast and Nusa Lembongan. Most were still at the planning stage in PLN's 2023 lists.
Rooftop solar at home
Rooftop solar is becoming common on villas. A system connected to the grid has to be approved by PLN and installed by a registered installer, and PLN sets limits on how much a home can feed back. Many villa owners add batteries so the solar keeps the lights and the router on during a power cut. See electricity in Bali for meters and tokens.